ADENA Pike Medical Center - Waverly, OH

Recently Complete Project

Scope of Work


Two new 150 HP Cleaver Brooks CB Ohio Special Boilers.

New Feed water system.

New Deaerator Tank System.

Misc. concrete removal and replacement to install new floor trench drain system, new access ramp in to boiler room for owner access, remove and replace wall louvers to allow access in basement boiler room for boiler placement.


Work performed in conjunction with VMP Engineering Inc. from Columbus, OH