Recently Completed Project
Scope of Work
Remove and replace 3 ea. 750 gal, 6250 GPH steam powered water heaters.
Remove and replace a triplex water softener system.
Remove and replace several deteriorated domestic water, steam, and condensate piping systems.
Install a new 900 ft long 8” HDPE gas main to the central boiler facility via the directional boring method.
Coordinate multiple system shutdowns and tie-ins so as not to effect the operation of Southern Ohio Correctional Facility.
Worked completed in conjunction with DLZ Architecture Inc. from Columbus, OH