ODRC Southern Ohio Correctional Facility – Lucasville OH

Recently Completed Project

Scope of Work


Remove and replace 3 ea. 750 gal, 6250 GPH steam powered water heaters.

Remove and replace a triplex water softener system.

Remove and replace several deteriorated domestic water, steam, and condensate piping systems.

Install a new 900 ft long 8” HDPE gas main to the central boiler facility via the directional boring method.

Coordinate multiple system shutdowns and tie-ins so as not to effect the operation of Southern Ohio Correctional Facility.

Worked completed in conjunction with DLZ Architecture Inc. from Columbus, OH